Business Report
On October 3, 2000, BTI experienced a large-scale network outage which, according to preliminary reports, cost the company $456,000. Investigation of the problem determined that the outage was due to a protocol programming error. During this situation our entire network was analyzed and the results reported to the company. The error that caused the outage has since been corrected but the analysis discovered many more problems that could lead to situations like the one on October 3.The most serious problem is the age of our network. The system analysts determined that our network, while still adequate, is not up to the standards that are required to meet our clients' needs. We feel that for BTI to continue to be a competitive integrated communications provider, we must determine if a new network is needed and which system would be right for our needs. The purpose of this report will be to determine if the network at BTI is adequate to handle our clients needs as well as our own and if an upgrade or replacement of the system is needed. The digital communications industry is currently one of the fasting growing industries. In the last five yea
. . .
Some common words found in the essay are:
R&S Designs, Background October, Novell NetWare, Computer Network, R&S Design, BTI BTI, Training BTI, CONCLUSION BTI, SUMMARY BTI's, Media Pennsylvania, r&s designs, current network, file server, network analysis, packet burst, protocol analyzer, windows 95, dropped server connections, r&s design, entire network, project managers, router dropping packets, network analysis company, novell netware 41, bti continue competitive,
Approximate Word count = 2409
Approximate Pages = 10 (250 words per page double spaced)
|
 |